CM25 vs manual re-scheduling for Direct production orders

rescheduling the collective order manually works just fine. From 05.20.2014 I moved all orders to 03.20.2014 just by changing the collective order.



The same does not apply to CM25. I moved the order to 08.01.2014 but the suborders did not follow suit.

Wednesday 20 November 2013

PS Network characteristic authorisation


Hi all, 

Our requirement is to restrict some users from entering values for a specific characteristic in a network (not maintaining the characteristic). In the example that I have created I have used authorisation object C_TCLS_MNT according to the document below. I also have configured 2 organisational areas (E, N) 


The example I have created in our test system is the following: 

class ZPS_CHAR_TEST
Characteristics ZPS_CHAR_TEST and ZPS_CHAR_TEST2. 

For the first characteristic the organizational area in the class is se to to E whereas for the second it is N. 

 class.PNG



In PFCG, in the user role I have added authorisation object C_TCLS_MNT and allowed access ONLY to organisational area E. 




However when I go to CN22, the system allows the user to enter values for both characteristics? I was expecting to be able to enter a date only for the first characteristic. I want the second characteristic to be "Display" only






Am I using the correct authorisation object or should it be something else? What am I doing wrong?

http://wiki.scn.sap.com/wiki/display/PLM/Authorization+Objects

Tuesday 22 October 2013

Direct production order re-scheduling





Why can't I change the dates to 25.10.2013

Thursday 19 April 2012

Cancelled confirmations without cost






This is the confirmation list from the PM order. You can clearly see that the total hours are 0
and that confirmation #2 cancels #1 and confirmation #6 cancels confirmation #5





In KOB1 the cancellations  number #2 and #6 do not exist even though I can see them as confirmation
cancellations in the PM order. You can see that it goes from #1 to #3 and from #5 to #7. As a result there is a cost of 302euro, which is essentially the cost of confirmation #1 and #5.








You can see the cost in the order. There is no cost from material or PO neither has there been a direct FI entry. 

Friday 30 September 2011

BWART field not in Field catalog

I want to use a specific movement type for output determination. The field I need is BWART and it is table 499


I am going to use table 499 in an access sequence




As you see, feld BWART is not available for selection

I have added the field in table KOMB

and I can see it also in table V_T681F


So how come I can still not see field BWART in the field catalog?

Thanks in advance

Sunday 27 February 2011

Ad sense

Αυτή η ανάρτηση επιβεβαιώνει την κατοχή του ιστότοπου και ότι αυτός ο ιστότοπος συμμορφώνεται με την πολιτική προγράμματος του Google AdSense και τους Όρους και τις Προϋποθέσεις.

Friday 22 January 2010

Availability check

Hi everyone, I have the following situation. I am creating an order. Before releasing it I want to run availability check while having insufficient quantity. I am told that all materials are available If I release the order and then re-enter and run availability check I get a material shortage notification. In customizing (transaction OIOI) I have the following settings.